140 Sussex Street, Sydney

Workplace

140 Sussex Street, Sydney 2021-04-22T10:56:33+10:00

Project Description

  • Full refurbishment of base building power, lighting and communications infrastructure within an occupied building.
  • Demolition – removal of switchboards, lighting, power and data systems in a 14-level office building with 3 car park levels.
  • Installation of 2 main switchboards and incoming consumer mains – 1400A supply over one weekend with no interruption to the building’s existing tenants. Ergo Group installed bypass switches to existing restaurant and reticulated their power from the site generator – this resulted in savings for the client in excess of $60K.
  • Complete replacement of switchboards and light fittings throughout the building.
  • Generator controls and BMS integration.
  • Ergo Group completed the project in 9 weeks despite a 3 month program.
  • Installed all BMS cabling.
  • Full Dali lighting control system throughout.
  • Installation of energy monitoring system.
  • Relocation and refurbishment of existing Power Factor Correction Units.
  • Building was occupied by a restaurant, 5 office floors and 3 car park levels – works were carried out without disruption to existing tenants.
  • Ergo Group delivered the project well within the program with significant cost savings to the client.